When we have parallel sets of service entrance conductors, that exceed 1750MCM per phase at the main service equipment, are we required ONLY to use the maximum main grounding electrode conductor size of a 3/0cu / 250MCM Alum, or would we be required to apply 250.24 (c)(1)-sum of conductors per phase X 12.5% to size it ?