Yes, it includes continuous loads but does not include factoring 125%. That's in 210, 215, 230.I wonder as well. An Article 220 calc by definition already includes any continuous load (if any). You don't need to add any load as continuous again.
More to the point, residential installations seldom have continuous loads.