hhsting
Senior Member
- Location
- Glen bunie, md, us
- Occupation
- Junior plan reviewer
I have 1600A main service switchboard 277/480V plans say manufacturer provided main bonding jumper per NEC 2014 section 250.24(1)(4), 250.28(c), 250.8(a)(7).
I thought if manufacturer provides the main bonding jumper it is installed in factory. Has anyone ever had to install manufacturer provided main bonding jumper?
I thought if manufacturer provides the main bonding jumper it is installed in factory. Has anyone ever had to install manufacturer provided main bonding jumper?