Question regarding main supply for a house we're building?
Plan is to install a Dual 200 amp meter at corner of garage, next to garage doors.
Then run conduit under garage slab through basement foundation wall.
Then we'll have two 200 Amp panels with the disconnect right on the other side of the foundation wall.
Is this permisible? Thx