Russ Hansen
New member
- Location
- Burlington, Washington, USA
Mike,
Off the secondary side of a transformer I am running underground directly into a main tie main. No disconnecting means at the utility transformer. Is there a maximum distance above grade I need to be before I need to have a main breaker? If so could you provide a code article for me?
Off the secondary side of a transformer I am running underground directly into a main tie main. No disconnecting means at the utility transformer. Is there a maximum distance above grade I need to be before I need to have a main breaker? If so could you provide a code article for me?