Designer69
Senior Member
If my main service equipment has a 65KAIC rating but the downstream smaller panels or loadcenters have a 10 or 22KAIC rating then wouldn't they be the weakest link? How is the initial 65KAIC maintained throughout?
Thank You
Thank You