We need to do an interconnection with an existing MDP. There is a LOTO procedure and drawings and description about what and how to do it. The space behind the MDP is completely filled with existing cables. We have to be there. What are exactly the regulations for that? I mean do we have to cover those existing cables with something before we move there. Just standing on those cables doesn't seem quite right to me either. Of course, the power is off when we go to work there. I can't find the exact regulations how to deal with these existing cables. I hope someone can help.