Mddocstanley
Member
I am installing a 400 amp residential service. I do not seem to be able to find a 400 amp manual transfer switch with an integral OCPD. I am limited severely with space and would like to keep pieces of equipment at a minimum. I am installing first the Meter can, next the Manual transfer switch and then next to it the 400 amp load center, all 3 pieces of equipment are side by side. Since I cannot find the manual transfer switch as described I am thinking that installing one without integral OCPD, and then the loadcenter with a 400 amp main breaker, may be all I need for this install. The manual transfer switch is rated for use a service equipment and has an "off" position. Question:#1- are the conductors from the service lateral to and through the manual transfer switch to the Main breaker on the loadcenter considered the service entrance conductors? #2 Would the transfer switch be considered the service disconnect and the Main breaker in the loadcenter the OCPD satisfying article 230.91?
Thanks for the input in advance.
Thanks for the input in advance.