Manual Transfer Switch for Load Bank and Temp Gen. Tap Boxes

Status
Not open for further replies.

cyriousn

Senior Member
Location
ME / CT
Occupation
EE & BIM
Would there be a code violation for using a manual transfer switch to choose between two tap boxes? One for a temp. generator connection and one for a load bank connection. All directly through a generator switchboard. The temp. generator cabinet would be kirk keyed to open only when the two generator breakers were locked. Owner has two boxes already and would rather not buy a separate dual purpose unit. Still trying to figure out if it will cost more to buy the manual transfer switch though.
 