I would like to install a manual transfer switch in between the meter and the 200 amp single phase panel in a residential home. Do I need to have a means of overcurrent protection before the transfer switch, or is it OK if the transfer switch is "Service rated". Then would I need to bond the neutral and ground in the transfer switch and treat the main panel as a subpanel, separating the neutrals from the grounds.
Please advise!
Please advise!