This maybe a stupid question and after a while in the industry I still fully don't understand something maybe someone can give me some clarification in laymen's terms, let's say I have an 800 amp MDP being ved via 2 sets of 500mcm with 4 200a switches . And I installed 4 200a 3 phase 40ckt MLO panels .Assuming there's no additional loads . In my eyes each set is capable of carrying 800 amps not 800a equally devided between the 3 phases. how many 2 pole 30s could I put my math says 80.
Sent from my SM-G950U using Tapatalk