jango
Senior Member
We have a large piece of property (approx. 5 acres) where we will be running many PVC conduits in trenches for power, phone, TV, security, etc. and is there a maximum distance allowance of a continous run of PVC pipe where we need to install pull points (christy boxes). I know we cannot exceed 360 degrees of total bends but if we are within that, is there a requirement of maximum distance before we need to plan on installing pull points (christy boxes)?