Is it permitted to use an abandoned gas riser in a midrise/highrise in NYC to run electrical MC cable to serve new electrical stoves?
So technically you are not using the gas pipe as a conduit only as shaft. Please let me know your thoughts.
Another issue would be the downsizing of the gas riser as you go up in the building, then you would have to downsize the MC cable. In this case, you would need a load center/breaker before you downsize the MC cable.