I am working on a commercial project in Irvine CA. We have been asked to take quite a few existing MC Cable branch circuits and pull them through a sleeve (EMT) so the ceiling looks "cleaner". Its an exposed area and they just dont like the look of MC Cable. I cant really find anything in code book that says we cant do it but it just does not seem right. I would much rather just demo it out and run conduit and pull wire but they are insisting on their method of installation. Can anybody provide me some information or feedback to strengthen my case of new conduit and wire instead of pulling MC Cable through EMT?
Thanks!!