I was doing some side work and was told to install two flush mounted out side lights on an outside column in a commercial setting .He had me work off the reel that was 12 -2 , after runing the mc and snaking the mc through the columns I grabed the lights and noticed that they were emergency combo .so they should've been ran with 12-3 for the steady hot. When I told this to the ec he said just tape the grounding conductor red.I told him that the mc sheathing isn't rated to carry ground faults ,he said I no but you already ran it and it's a long run plus we don't gave any more 3wire left over . Can this instal cause a fire I really don't like doing things the wrong way .
 
The metallic jacket doesn't qualify as an EGC so the question is will it still be good enough to provide protection in the case of a fault. Testing would indicate that it probably is no good. IMO the length would have something to do with the jacket's real world ability to open the OCPD.
 
Status
Not open for further replies.
Top