liquidtite
Senior Member
- Location
- Ny
Does mc need to be sleeved through 4" inch concreat slab ?
I thought bc concreat contains moisture so mc should be transfered to conduit when penetrated concreat slab to panel.
I thought bc concreat contains moisture so mc should be transfered to conduit when penetrated concreat slab to panel.