Hear is my topic - Stripping off the end of MC/AC sheathing (say 10') and terminating with a proper connection to EMT, and putting these wires in the EMT. Also terminating to a box and doing basicaly the same thing. The question is are these wires acceptable in EMT? I know in the NEC is says that the wire needs to be marked every 2', so if you look at THHN it has the wire info every two feet. Wires in MC/AC are not marked. Would this fall in with AHJ ? (Authority having jurisdiction)