MCC and Switch Board Panel Schedules

Status
Not open for further replies.

United36

Member
How do you correctly represent MCCs and Switchboards on panel schedules. It's pretty clear how to do it for a standard 42 position panel but MCCs and switch board have all kinds of funky layouts. Some of have two rows, some one row, and a MCC is basically laid out in a grid pattern. I just want to represent something that the installing contractor will understand in the field. Any pictures or examples of what you have put or seen on drawings would be very helpful....

Thanks!

AA
 
How do you correctly represent MCCs and Switchboards on panel schedules. It's pretty clear how to do it for a standard 42 position panel but MCCs and switch board have all kinds of funky layouts. Some of have two rows, some one row, and a MCC is basically laid out in a grid pattern. I just want to represent something that the installing contractor will understand in the field. Any pictures or examples of what you have put or seen on drawings would be very helpful....

Thanks!

AA

In my experience with "one lines" everything included with an MCC is included with a box made of dashed lines. As such all of the motor starters an panel board schedules would be shown with that box. This would be the same with switchboards also.
 
Status
Not open for further replies.
Top