I have a Contractor who installed 15KV EPR cable through a series of manholes starting back on 12/22/04. There has been numerous delays in this project and the cable still has not been energized. I can't find anything in NEC that addresses this issue. The cable has been spliced in most manholes, however in 3 locations it's just got a heat shrink end cap.