I'm putting in a secondary feeder service switchgear and I'm debating the merits of having one versus two metering sections.  If the latter, I won't have the single point of failure that one metering section represents.
I'm not sure it's worth the cost however. I'm wondering what's chances of this causing a problem. Any anedotal experieces and general inputs would be appreciated.
thanks,
Mike
	
		
			
		
		
	
				