jamesmorris
Member
- Location
- New jersey
Does metal clad cable need to be sleeved passing through a cored hole through concrete?. I see Romex does per code at least 6" above floor but I didn't see anything about mc cable
Does metal clad cable need to be sleeved passing through a cored hole through concrete?. I see Romex does per code at least 6" above floor but I didn't see anything about mc cable
IMO. You might well be in a AHJ call area. I can't see a sleeve would be directly required, but if it were judged that the conditions "subjected the cable to physical damage" then 330.12 would come into play.
I agree that would be the proper rule to follow but to you see it as "Code required" ?For us if it comes up inside a wall no sleaze needed.
If it comes up through the floor exposed than a sleeve is needed.
I agree that would be the proper rule to follow but to you see it as "Code required" ?
(am I overlooking something)