Ken9876
Senior Member
- Location
- Jersey Shore
If you run a GEC without pipe or in a wireway and secure it with metal pipe clamps, would this be to code or would it violate the NEC and would it cause a choking effect if there was a fault?
I have seen it done with 3/8 inch one hole straps. Since we don't have 3/8 inch pipe, what else would they be used for?? :?