I have installed 3 panels for a multi-unit/3 meterbox remodel house (public panel, 1st floor, 2nd floor) in Chicago. I am having trouble finding how I am supposed to provide a GEC to the waterpipe for each panel. I was told I cannot interconnect the panels and jumper a cable between them (I knew it was wrong but I took a shot). I am looking through the 2011 NEC and cannot figure out the wording for the situation I have encountered. Does anyone have a clear answer and/or point me to the proper code to look at?