Looking at a job that is not fully designed. Looking at thefeeder sizes and qty of sets going to the meter banks seems like overkill. 4sets of 500’s THHN in EMT gives you about 1500A. The distance is about 150’.Each meter bank serves about (15) 100A panels.
Are these feeder way over sized. If someone could help mefigure the calc I would appreciate that. I’d like to know.