need to replace a service next week. Pulling out the old meters in the basement and installing meter banks on the exterior. i've only done a few meter banks and so far have only had to go thru wood to get the 100a SER's to there respective panels. In next weeks case, the lower portions of the meter banks are over a concrete basement wall. Not sure the easiest method, core drill some LB's through and run the SER through those, Wireway under the Banks and either core drill behind or run conduit up to the sill, Core drill behind the banks for a conduit (how would that work with the Z channel to mount everything). Any restrictions on running multiple SER in pipe above ground?
Thanks for any thoughts