360Youth
Senior Member
- Location
- Newport, NC
Do meters fall under the same clearance requirements as load side equipment. I have seen several installs over the years that have surprised me over the lack of clearance, but I ask this time because we have been asked to change an existing meter base that I am already consulting AHJ because I do not want to make the call on this one. Retro jobs are usually allowed to stay as is depending on the amount of change involved. I am probably going to price changing the overhead LB because I noticed some fittings issues, but outside of that it will be meter and feeder LB only.