82ndairborne
Member
- Location
- Naples FL
- Occupation
- Electrical contractor
I had to raise a meter main that was below flood due to electrical inspector passing the meter main below flood level. I was not the original EC. I was tasked to do a generator and noticed the meter main below flood. Obviously when I went to pull the permit that became an issue for the generator and all the equipment had to be raised up. On the installation day the inspector came out to do the inspection and said that I was not allowed to punch the top of the meter . The inspector now wants me to provide a letter From manufacturer to the city Saying this is allowed. I installed utilizing Myers hubs. Anybody's take on this would be helpful.