SomeRandomPerson
Member
- Location
- Massachusetts
- Occupation
- Electrician
Quick question. I’m new to doing service changes. Did a walk through today and we’ll be bringing conductors down from the point if attachment in 2” pvc, to a 200amp meter main. Is it accurate to consider everything past that breaker to the main panel as if it were a sub panel and grounds and neutrals are now separate? Does it also mean the water meter grounding electrode should be brought back to the meter? The journeyman I walked through with today said several things, corrected himself then changed his mind again. I’m just an apprentice and a bit hesitant to question him outright.
Sent from my iPhone using Tapatalk
Sent from my iPhone using Tapatalk