FaradayFF
Senior Member
- Location
- California
Hello,
In scenario where meter mains are considered a service disconnect, is the neutral bar factory bonded to the can? For 120/240V service, I'm going to have 4 wires coming out of the meter mains to the ATS downstream. Can I connect EGC and neutral to the same bus bar in the meter mains enclosure?
Thanks,
EE
In scenario where meter mains are considered a service disconnect, is the neutral bar factory bonded to the can? For 120/240V service, I'm going to have 4 wires coming out of the meter mains to the ATS downstream. Can I connect EGC and neutral to the same bus bar in the meter mains enclosure?
Thanks,
EE