Anyone else following the MN Railroad debacle?
Basically, a catenary substation was fed with a buried 138KV line, with redundancy in the firm of a 2nd feeder. ConEd took one down for maintenance. Then, the remaining line faulted, closing down a ~10 mile segment of one of the busiest commuter lines in the country.
They kludged up a small sub in a parking lot, fed by an existing 13KV resi feeder, and tied it to the cat. That got them ~10% of the needed capacity. Meanwhile, ConEd was digging freeze pits and frantically getting down to the faulted section.
I'd not want to be a homeowner sharing that feeder. A few 9MW single phase loads will not make the local distribution happy....
Basically, a catenary substation was fed with a buried 138KV line, with redundancy in the firm of a 2nd feeder. ConEd took one down for maintenance. Then, the remaining line faulted, closing down a ~10 mile segment of one of the busiest commuter lines in the country.
They kludged up a small sub in a parking lot, fed by an existing 13KV resi feeder, and tied it to the cat. That got them ~10% of the needed capacity. Meanwhile, ConEd was digging freeze pits and frantically getting down to the faulted section.
I'd not want to be a homeowner sharing that feeder. A few 9MW single phase loads will not make the local distribution happy....