ASG
Senior Member
- Location
- Work in NYC
- Occupation
- Electrical Engineer, PE
1) What section of the NEC states I can use the capacities on the cut sheets?
2) What minimum size ground can I use? For example, if I had an 400A feed can I use smaller than #3 ground?
2) What minimum size ground can I use? For example, if I had an 400A feed can I use smaller than #3 ground?