Hi,
I'm aware the building code in NYC (and many other jurisdictions) prohibits conduit / wiring in an egress stairwell without being enclosed in a 2 hour fire rated enclosure, unless the circuits are for loads specifically within the stairwell.
If you route MI cable in the stairwell, which has a 2 hour fire rating, would this free you from needing the 2 hour rated enclosure?