mstrlucky74
Senior Member
- Location
- NJ
Anyone ever do an overall( labor and material) cost analysis between MI cable and 2 hour MC Cable e.g. Vitalink given the same size load? Thanks.
Both offer 2 hour protection. Why not? Vitalink is the 2 hour MC cable.MI is definitely higher labor.
How can you even have an option of MI vs MC?
If it's for a generator, you would have to have locked rotor rated switching ahead of the MC feeder.....and those are not cheap