Jimmy7
Senior Member
- Location
- Boston, MA
- Occupation
- Electrician
I did my first mini-split system for a relative of my wife a while back. Locally it seems that all of the hvac contractors run all the cables between the inside and outside units. This system had two indoor units, so the contractor ran two runs of duktstrip cable. In any case, I thought I would do a good thing and sleeve it non-metallic liquidtight from where it exits the house to the back of the outdoor unit. The thing is that I used metal bell boxes to transition the non-metallic liquidtight, so I forgot about grounding the metal boxes. Since it’s a relative I was thinking I should change out the boxes to plastic. Is there some other way to do this, or would you even bother?