I have searched the forum and it seems the waters are still muddy for me about this.
The situation is 1 1/2" Schedule 40 PVC in a roadway concrete encased. 240v lighting circuit to be installed.
I read 300.5 as a minimum of 24" of cover over conductors for a roadway. Another Jman at work keeps arguing that if it is under a minimum of 2" concrete, than it only has to be 12" cover.
Does the concrete cover superceed the roadway requirement in any way?
Thanks,
The situation is 1 1/2" Schedule 40 PVC in a roadway concrete encased. 240v lighting circuit to be installed.
I read 300.5 as a minimum of 24" of cover over conductors for a roadway. Another Jman at work keeps arguing that if it is under a minimum of 2" concrete, than it only has to be 12" cover.
Does the concrete cover superceed the roadway requirement in any way?
Thanks,