So I don't have the ability to draw a picture, but picture (2) 4" conduits coming out of slab and terminating into a panel. Next to the panel is a bunch of home run conduits. So what I did was run a 8x8 inch wireway under the gutter and used close nipples wih double locknuts between them. I know there is a table for minimum wire bending and width of gutter but I am not sure how it would apply to this situation. The wires are 750 AL.