B butch Member Nov 20, 2005 #1 Im currently working on a job that I must pass over an existing roof of a mobile home.How much clearance should be allowed.[
Im currently working on a job that I must pass over an existing roof of a mobile home.How much clearance should be allowed.[
LarryFine Master Electrician Electric Contractor Richmond VA Location Henrico County, VA Occupation Electrical Contractor Nov 20, 2005 #2 Re: Mobile home roof clearance. 12.5 feet. (Table 225.61, '02 NEC) [ November 20, 2005, 02:31 PM: Message edited by: LarryFine ]
Re: Mobile home roof clearance. 12.5 feet. (Table 225.61, '02 NEC) [ November 20, 2005, 02:31 PM: Message edited by: LarryFine ]
W websparky Senior Member Location Cleveland, Ohio Nov 20, 2005 #3 Re: Mobile home roof clearance. Larry, Wrong section! 230.24(A) is for under 600V. Eight feet is the minimum unless the roof pitch is greater than 4-12.
Re: Mobile home roof clearance. Larry, Wrong section! 230.24(A) is for under 600V. Eight feet is the minimum unless the roof pitch is greater than 4-12.
B benaround Senior Member Location Arizona Nov 20, 2005 #4 Re: Mobile home roof clearance. Butch, This is a service you are talking about correct?
W websparky Senior Member Location Cleveland, Ohio Nov 20, 2005 #5 Re: Mobile home roof clearance. 225.19 covers feeders which have the same requirements.
A allenwayne Senior Member Nov 21, 2005 #6 Re: Mobile home roof clearance. Check with POCO also,some do not allow any service drops across any roof Flat or pirched
Re: Mobile home roof clearance. Check with POCO also,some do not allow any service drops across any roof Flat or pirched
B butch Member Nov 21, 2005 #7 Re: Mobile home roof clearance. Gentlemen, Thankyou very much I will check with the poco but there is no way to go underground in this particular situation the trailor is sitting on a concrete slab. I will find out from them the height they want to clear myself. Again thankyou.
Re: Mobile home roof clearance. Gentlemen, Thankyou very much I will check with the poco but there is no way to go underground in this particular situation the trailor is sitting on a concrete slab. I will find out from them the height they want to clear myself. Again thankyou.