I have a 480 VAC panel with starters and VFDs. Because there is the possibility of opening the cabinet (for troubleshooting) while energized, and because there is grounded equipment in front of the panel, I believe I need 42" working clearance in front of the panel, even though the energized / exposed components are in the back of the panel and the panel is 24" deep.
- The code seems pretty clear to me - but am I correct to take the 42" from the front of the panel and not from the internal, exposed components?
- If the power distribution blocks / terminations are covered/made fingersafe through protective shields/other means - are these still considered 'exposed'? I am thinking they are still exposed but looking for other opinions.
- The code seems pretty clear to me - but am I correct to take the 42" from the front of the panel and not from the internal, exposed components?
- If the power distribution blocks / terminations are covered/made fingersafe through protective shields/other means - are these still considered 'exposed'? I am thinking they are still exposed but looking for other opinions.