ron pfeiffer
Member
- Location
- Illinois
RECENTLY THERE WAS A MOTOR STARTER MOVED BY A CONTRACTOR ABOUT 10'AND THEY INSTALLED A 3/4 EMT TO HANDLE THE #8AWG. 3PHASE FEED TO THE STARTER AND IN THE SAME PIPE THEY PULLED THE MOTOR FEEDS. THE PIPE IS HOT AND IN THE JUNCTION BOX THE CLEAR PLASTIC ON THE WIRES IS CRACKING OFF DUE TO THE HEAT. SHOULD THE WIRES BE SEPERATED IN 2 PIPES OR SHOULD A LARGER EMT BE INSTALLED TO ALLOW MORE AIR SPACE. THANKS