Are there any jurisdictions out threre that are requiring outdoor equipment to be installed on walls that are "pre-finished" rather than mounting directly to the raw block?
The 2004 FBC requires significant protection of moisture entry on raw walls. Most installations of meter enclosures, disconnects, ect.. are made before any treatment is made to the block walls. And considering 312.2(A), this leaves a mandated 1/4" airspace behind electrical equipment that is raw block.
Should we consider caulking or other sealing means? Does the stucco or other finishing surfaces provide the needed barrier for water entry? Or, should we start requiring the block to be pre-treated?
The 2004 FBC requires significant protection of moisture entry on raw walls. Most installations of meter enclosures, disconnects, ect.. are made before any treatment is made to the block walls. And considering 312.2(A), this leaves a mandated 1/4" airspace behind electrical equipment that is raw block.
Should we consider caulking or other sealing means? Does the stucco or other finishing surfaces provide the needed barrier for water entry? Or, should we start requiring the block to be pre-treated?