We did an awsome job with the conduit work in this electric room.The HVAC installer came in behind us and installed the heating and cooling system for this room.The unit has a power venter enclosed in the ductwork which requires 24v to operate.They ran LFMC to the venter and attached the raceway and the junction box to the outside of the ductwork associated with the unit.To me this is a no-no but I cant provide a code reference to back it up.Does anyone have any input?