Hey everyone first time post here Greetings
We are moving about 20 circuits out of a bathroom mix of Knob and tube as well as older romex
What options are there when customer doesnt want existing panel to stay with a large steel cover over it ( turn old panel to j-box)and ceiling is drywall
We could cut the drywall mount box-- or boxes 20 circuits to work P anel circuits moved about 15 ft out bath to new area
Service will be changed to accomedate a Disconnect means outside
After inspector leaves customer may drywall area over
We are moving about 20 circuits out of a bathroom mix of Knob and tube as well as older romex
What options are there when customer doesnt want existing panel to stay with a large steel cover over it ( turn old panel to j-box)and ceiling is drywall
We could cut the drywall mount box-- or boxes 20 circuits to work P anel circuits moved about 15 ft out bath to new area
Service will be changed to accomedate a Disconnect means outside
After inspector leaves customer may drywall area over