stevebea
Senior Member
- Location
- Southeastern PA
When adding a subpanel beside main panel, can someone give me the code article that when moving a branch circuit from the main to the subpanel ALL ( grounded, ungrounded, and ground ) must be moved to subpanel. Thanks.