Sparky9876
Member
- Location
- Pa
I’ am currently bidding a job for a a triplex. Each of the 3 units will have its own 100 Amp panel, and the House panel will be a 50 amp. I am considering bringing in a 400 amp feed, is that over kill or is that the correct service size i should be using for this project?