Buddy of mine asked me a question regarding conduits sharing multiple tenant subfeeds as in if its permitted to run multiple sub feeds for different units in same conduit to pullboxes out of the gutter of a multi metered section.
Other than a derating factor I dont see an issue with it. Any thoughts on this.
Again these are the subfeeds after main disconnect
Other than a derating factor I dont see an issue with it. Any thoughts on this.
Again these are the subfeeds after main disconnect