The Archangel
Member
- Location
- Loveland, Colorado, Larimer County
A very old house with a small panel would like to add a hot tub. As the existing panel is full, this will require the addition on a sub panel.
To accommodate to the new sub panel, two existing circuits will have to be relocated to the new sub panel.
THE PROBLEM: Every circuit is split, (left and right) and sharing a neutral. I.E. 1&2, 3&4, etc. So if you relocate circuits 2&4 in favor of the new two-pole to feed the sub panel, then the neutral that feeds them is also feeding circuits 1&3.
In which panel would they properly belong?
To accommodate to the new sub panel, two existing circuits will have to be relocated to the new sub panel.
THE PROBLEM: Every circuit is split, (left and right) and sharing a neutral. I.E. 1&2, 3&4, etc. So if you relocate circuits 2&4 in favor of the new two-pole to feed the sub panel, then the neutral that feeds them is also feeding circuits 1&3.
In which panel would they properly belong?