i'm bidding a multi-family building.
i seem to think i read something about conductors from one apt not being allowed to pass through another unless its in conduit; is that correct?
the situation is there is a pad at the end of each building that has all the condensing units. 10/2NM is specified.
thanks
i seem to think i read something about conductors from one apt not being allowed to pass through another unless its in conduit; is that correct?
the situation is there is a pad at the end of each building that has all the condensing units. 10/2NM is specified.