I have a set of plans for a strip shopping center( 3 seperate Buildings)fed from a single service on one of the buildings.
2 issues I am concerned about.
Neither subfed building has a main disconnect. Each of these buildings will have a trough with space for future tenent disconnects and in one buildings case more than 6 disconnects.
Would the 6 disconnect rule apply to buildings fed from other services ?
Also the subfed buildings have house circuits (lighting and GFCI's) fed from a house panel at the original service.
This sounds like an issue, having branch circuits with no form of disconnect at the local building. However I can not find a code referance that does not allow this.
Any help would be appreciated, thanks in advance.
2 issues I am concerned about.
Neither subfed building has a main disconnect. Each of these buildings will have a trough with space for future tenent disconnects and in one buildings case more than 6 disconnects.
Would the 6 disconnect rule apply to buildings fed from other services ?
Also the subfed buildings have house circuits (lighting and GFCI's) fed from a house panel at the original service.
This sounds like an issue, having branch circuits with no form of disconnect at the local building. However I can not find a code referance that does not allow this.
Any help would be appreciated, thanks in advance.