I have a question regarding a multiple dwelling unit (3 units). We have a 200A, 3phase, 208v serivce that goes underground into a building to a 200a fused disconnect, tapped to 3 meters and from the meter to the respective disconnect for the unit (2-50A disconnects and (1) 100A disconnect). Are the (3) disconnects after the meter considered "serivce disconnects". I'm a little concerned because we installed 60A main lug "loadcenters" with a 50a c.b., but I don't think they qualify for service disconnects, if that is what they are considered (I didnt do it for the money, space was a real concern). Also, the neutral in bonded in the 200a disconnect, so obviously we don't do any bonding in the disconnects for the units, correct?