Re: Multiple Grounding Conductors
...very interesting topic. This generator load bank is really "test equipment" isn't it? I wonder if the code would even apply.
They hook it up, run the test, and disconnect it.
Would the AHJ require a permit? Inspection?
What about when you connect your DMM into a circuit to check voltage? Covered by Code? Okay, maybe I am stretching it...
A major telecommunications company had a load bank they used to test their UPS system a couple of times a year. They would have us come in to make the connections and hang around during the test, then disconnect it afterwards. I can tell you that the cables were only about half of what is required by Art 310 based on amperage. Max amps tested was around 450. For a 1 hour test, the cables would get a little warm, but the telephone company engineers were cool with it, they were the ones who figured the size they needed, not us.